about us


image

PT. FAST INDONESIA has changed its name to PT. FAST TECHINDO INDONESIA set on 25th, April 2022 is a private owned limited company, was established on September 2011. this company recognized in Indonesia for services in providing construction and technical services in the oil, gas and mining industry. As it develops, PT. FAST TECHINDO INDONESIA has expanded its scope of services through the years to cover activities that comprise :

   »Hot Tapping, Plugging and In Services Welding
   »NDT, Hydrotest, Construction and General Supplier

Today, PT. FAST TECHINDO INDONESIA is handling several projects in several areas, such as Sumatera, Java, Sulawesi, Kalimantan and Papua with the main office in Jakarta. The company fully utilizes national talent compliments with external resources when required. PT. FAST TECHINDO INDONESIA partners with Armindo Fabricator and LAPI ITB

MANAGEMENT POLICY
PT. FAST TECHINDO INDONESIA Principal objective is to provide expertise, reliable inspection equipment, and independent inspection services of right quality in compliance with the contractual requirment and applicable codes and standards.
 
In order to achieve the objectives all organizations and individuals to be assigned for the project shall have the responsibilities to perform their own activities in accordance with the contractual requirement.

DWI RINASTUTI, SE., AKT.,
President Director
image

Board of Directors

DWI RINASTUTI, SE., AKT.,
DWI RINASTUTI, SE., AKT.,
President Director
SOBINTA HADA
Director
JUHAEDA
President Commissioner
GILANG FAKHRUROZI
Commissioner

image
image

our Services

HOT TAPPING, PLUGGING, PIGGING, WELDING, HYDROTEST AND GENERAL SUPPLIER

As our core services, we able to provide hot tapping up to 72 inches pipe and plugging or line stopping up to 72 inches. Hot Tapping or Pressure Tapping is the method of making a connection to existing pipes or vessel while that existing system is under pressure. This method employs a drilling or tapping machine, a full port valve and a pressure fitting attached to the existing pressurized system. A necessary element in the hot tap connection is the full ported valve, which can become a control valve for the new connection, and allow the drilling machine to be removed after the cutting operation. Gate valves and other full ported valves with flanged and screwed connection range 150# through 900# ANSI Rating. Plugging or Line Stopping is a means of stopping flow and providing a shut off where non exist. Line stopping can be used to isolate piping system for repairs, alterations or relocations. Potential application exists in all types of private and public utilities, process industries, institutions and cross country pipeline.

contact us

Address :
Office :
Putra Jasa Officer Tower Lt. 12 Ruang 1201, Jl. Jendral Gatot Subroto Kav. 32-34, Kuningan Timur, Jakarta Selatan
Province DKI-Jakarta - Indonesia
Telp/Fax : +6221-7533798-99
Cellphone : +62-81311667768
: +62-8129611465


Branch Office :
JL.Mayjen Sutoyo Tegal Wangi, Merak No.9 Cilegon 42436
Province Banten - Indonesia
Telp/Fax : +62-254 - 38675
Cellphone : +62-81911123607
  • image
  • image
  • image